Children 1st Houston / Bldg-1 / Central Plant / Hot Water / Boiler Plant
READ ONLY · DEMO SEQUENCE - NOT LIVE
GRAPHIC NOT COMMISSIONED Showing a realistic HW plant sequence so the operator graphic is readable; live site bindings still pending. Commands disabled until write-safety gateway is commissioned
CENTRAL PLANT · HW HYDRONIC SCHEMATIC HWS-SP 160.0°F · ΔT TARGET 22°F B GAS · 2-VALVE HWS HWR BOILER #1 (LEAD) · BLR-1 · FIRETUBE FIRETUBE PRESSURE VESSEL FIRING 55% FL PROVEN ON / PROVEN B GAS · 2-VALVE HWS HWR BOILER #2 (LAG) · BLR-2 · FIRETUBE FIRETUBE PRESSURE VESSEL STANDBY · ROTATION STANDBY DECOUPLER / BYPASS M VFD-HWP-1 HW PUMP #1 (LEAD) 65% M HW PUMP #2 (LAG) STANDBY EXP TANK MAKEUP · RPZ + PRV · GLYCOL FILL TO AHU / VAV REHEAT HWS · HW-S-T 160.0°F HWS-SP · HW-RESET 160.0°F HWR · HW-R-T 138.0°F HW-DP 8.4 psid BLR-1 STACK 310°F HWS → LOAD HWR ← LOAD MODE HEATING HWS-SP 160.0°F BLR STG 1 OF 2 · BLR-1 LEAD/LAG HWP-1 / HWP-2 HW-DP 8.4 psid MAKEUP OK SOURCE DEMO scene=hot-water-plant-1 · binding=missing · flow=demo · v=svg-first-webgl-ready
POINTScmd · value · setpoint · reliability
PointValueSP/CmdStatusTrend
BLR-1 STATON / PROVENEnableMissing
BLR-1 FIRE55%ModulateMissing
BLR-1 FLAMEPROVEN--Missing
BLR-2 STATSTANDBYLagMissing
BLR-2 FIRE0%--Missing
HWS160.0°F160.0°FMissing
HWR138.0°F--Missing
HWS-SP160.0°FResetMissing
HW-DP8.4 psid8.0 psidMissing
HWP-1ON / PROVENLeadMissing
HWP-1 SPD65%ModulateMissing
HWP-2STANDBYLagMissing
Commissioning binding health: Bound 0 Stale 0 Demo 0 Missing 12 Most slots are unbound — semantic point binding for this equipment is incomplete.