Children 1st Houston / Bldg-1 / Roof / RTU Equipment Graphic
READ ONLY · DEMO SEQUENCE - NOT LIVE
GRAPHIC NOT COMMISSIONED Showing a realistic RTU sequence so the operator graphic is readable; live site bindings still pending. Commands disabled until write-safety gateway is commissioned
RTU-1 · 7.5 TON OA HOOD M RETURN AIR (RA) M MIXED AIR (MA) FILTER BANK DX COIL C1 CLG-STG1 C2 CLG-STG2 GAS HEAT HX M SUPPLY FAN SF-1 / VFD SUPPLY DUCT SA → SMK-ALM LT-ALM SAHS-ALM FILTER-DP OAT · OA-T 82.0°F RAT · RA-T 74.6°F MAT · MA-T 73.4°F SAT · SA-T 55.8°F DSP · SA-SP 1.12 inWC OA-DPR 24% SF-S RUN MODE: COOLING · STG1 · OCC · ECON DISABLED · DEMO scene=rtu-1 · binding=missing · flow=demo · v=svg-first-webgl-ready
POINTScmd · value · setpoint · reliability
PointValueSP/CmdStatusTrend
SF-CAUTOOccupiedDemo
SF-SRUN/PROVEN--Demo
SAT55.8°F55.0°FDemo
MAT73.4°F--Demo
RAT74.6°F--Demo
OAT82.0°F--Demo
SA-SP / DSP1.12 inWC1.20 inWCDemo
OA-DPR / OAD-FBK24%Min 15%Demo
RA-DPR76%--Demo
CLG-STG1ONEnabledDemo
CLG-STG2OFFLocked outDemo
HTG-STG1OFFLocked outDemo
FILTER-DP / FLT-STATNORMAL--Demo
SMK-ALMNORMAL--Demo
LT-ALM (Freezestat)NORMAL38°FDemo
SAHS-ALM (Hi Static)NORMAL3.0 inWCDemo
Commissioning binding health: Bound 0 Stale 0 Demo 0 Missing 8 Most slots are unbound — semantic point binding for this equipment is incomplete.