WaitingCTU-1 group
Temp pending
drawings mapped · point binding next
Live Test Site · Read-only BAS supervisor
Children 1st Dental & Surgery Center
Children 1st / Blue Cloud · 8547-8549 Gulf Freeway, Houston, TX
Drawings and equipment schedule are loaded. Live BACnet database is currently empty in this Docker test instance, so point values are intentionally marked pending instead of pretending to be live.
24Expected devices
1739Mapped points
5RTU schedule
4Drawings
2M1 Floor Plan
Drawing overlay with BAS binding targets
BACnet bind127.0.0.1/24Discovery target configured, current container DB has no live devices.
Best graphicOpen generated floorplanCleaner operator map with room objects and value badges.
Safety modeView onlyWrite approval and command execution remain disabled.
Zone readiness
What operators should see next
Pre-OpRTU/CTU served
Airflow pending
temperature + airflow slots defined
OR SuiteCritical space
RH/pressure pending
humidity + pressure slots required
SterileCTU-5 group
Status pending
sterile-area binding priority
AdminZone sensor
Temp pending
low-risk comfort zone
RTU / CTU equipment
Drawing-derived schedule, ready for live points
Waiting / pre-op zones
1910 CFM · 375 OA · mapped from drawingsProcedure / support zones
2250 CFM · 400 OA · relocated roof unitClinical / PACU zones
1675 CFM · 400 OA · mapped from drawingsAdmin / support zones
1675 CFM · 275 OA · electric heatSterile / OR support
2955 CFM · 675 OA · new modulating gas heatLive BACnet database
No live devices in this test DB
Live scan/import required
The drawing package expects 5 RTUs and ~1739 mapped points, but this Docker DB has 0 rows. Next useful work is field-gateway point import, not more decorative polish.
Point binding status
Latest point inventory
Points are not bound yet
Zone cards are ready for temp, humidity, pressure, airflow, fan, alarm and occupancy slots. They need real BACnet import from the local gateway.